New Haden Pumps offers our expertise to service and maintain pumping equipment, we currently maintain an ever increasing number of pump stations all over the UK, these include water authorities, housing developers, retailers and private individuals. We are able to organise ongoing service arrangements for subsequent years beyond the guarantee period. We can repair your pump in our fully equipped workshop. New Haden Pumps offers a comprehensive range of spare parts for our range of products. We have fully trained service team who are trained to use gas detection equipment, confined space entry procedures and all relevant health and safety issues. We recommend that all pumping and related equipment is serviced and maintained at regular intervals. We are ISO 9001 Quality Assured, also Safe Contractors, CHAS and Vetted Contractors. Service Case Studies  | |  | | | | | ROYAL ALBERT HALL refurbishment in 1999 Installation of new pumping stations, in the refurbished basement area of the Royal Albert Hall. Whilst redesigning the basement of this world renowned auditorium, to facilitate tour vehicles, new pumping stations were installed. Comprising of GRP chambers with heavy duty foul and surface water pump sets and controls, all installed and commissioned by our own installation team. We currently maintain the pumps at The Royal Albert Hall. | | | BARBICAN CENTRE
Built in the late 60s, the existing solid diverters taking sewage from the lower toilet blocks were all coming to the end of their working life.
In 2004, New Haden pumps were engaged to design new sewage packages that could be installed in sections within very confined spaces and restricted access.
The problem was solved by utilising SEWPAC SS units with sectional stainless steel tanks, and dry installed pump sets.
Our engineers removed the existing cast iron diverter tanks and installed new pumping systems during a shutdown programme. We currently maintain the pumps at Barbican Centre.
| | | | | | | | |
|
|